Skip to product information
1 of 4

Schacht 11-inch Boat Shuttles

Schacht 11-inch Boat Shuttles

4.7 Rating, 3,152 Reviews
Regular price $38.88 USD
Regular price $54.00 USD Sale price $38.88 USD
Sale Sold out
Profile 1 Profile 2 Profile 3
Olivia verified and people bought
Size

Money-Back Guarantee

If you're not completely blown away by the experience, we'll give you a full refund no questions asked, you have 30 days to request a return.

100% Secure Check Out

Your information is fully protected with top-notch security technology. Shop with complete confidence and peace of mind.

Sale – Last 48 Hours!

Once the promotion ends, the product will return to its original price.

i UPDATE:
We're going viral on social media and stock is running low.
Order now before it's sold out again!

Schacht 11-inch Boat Shuttles have two options. 

One option is closed or open end. A closed end has a smooth wooden bottom; open end shuttles are open at the top and bottom.  Some weavers prefer the closed end, thinking it helps the shuttle to glide through the shed.  Others prefer the open end as they can place a finger under the shuttle and help control the spin of the bobbin.   Some of us have no preference!

The other option is slim or regular height. The slim height is good for smaller sheds as it's slightly less deep.  The regular height allows you to wind the bobbin a little fuller and has a more weight.   You may find it's good to have both sizes even if your loom has a nice wide shed as sometimes you may prefer the slim shuttle on a narrow warp. 

The Schacht Boat Shuttles do not come with a bobbin. However, we include one of our 4.5" Flare Quills with each purchase. You can also use both the Schacht and Leclerc 4-inch bobbins in these shuttles.

We also have the 11" boat shuttles with open bottoms in Cherry.  All other boat shuttles are hard maple.

Boat shuttles require a bobbin winder (manual or electric) for winding bobbins. 

Note: There is a production hold on the Closed Bottom Slim and Closed Bottom Regular shuttles at Schacht until the end of 2026.

Image 1

Image 3
View full details